BRIDGE Background cRiteria for the IDentification of Groundwater thrEsholds
|
Country: EU Projects
|
Start Date:
1/1/2005
Duration: 24
months
Project Type: Concerted Action
|
Contract Number: 006538 (SSPI)
|
Organisation Type:
EC Project |
Topics:
Contaminated land-->Risk assessment-->Receptor: Water Contaminated land-->Wider impacts / sustainability-->Economic Contaminated land-->Wider impacts / sustainability-->Social Groundwater protection-->Groundwater protection overview Water resources and their management -->Stresses, quality and ecological status Water resources and their management -->Water resources and their management Overview
|
Project objectives:
Workplan
Work-package 1: Survey of representative groundwater pollutants Project launching and co-ordination
The aim of this work-package is to describe the state of the art of natural and anthropogenic substances in groundwater (behaviour, ((eco)-toxicological effects, interactions with surface waters and ecosystems). All information collected will be included in a reference data base, including key words and brief abstracts. This data base will be the major input from WP1 to WP2. It will permit to better define impacts of pollutants to groundwater bodies. It is also a major input to WP3 to assess the conceptual model and methodology.
Work-package 2: Study of groundwater characteristics
The WP2 will focus on a holistic description of the specific criteria linked to the groundwater bodies to be potentially taken into account to characterise their chemical status. It will be the basis for the development of an approach for establishment of environmental thresholds. It will benefit from WP1 database about chemical pollutants. The characterisation of ground waters and the behaviour of key parameters obtained by this WP will be used by WP3 to define the methodology of threshold determination. Results of WP2 will be also used for socio-economic assessment of case studies testing (WP5).
Work-package 3: Criteria for environmental thresholds and methodology to define a good status
The aim of this WP is to propose a practical approach for a methodology to define the good status for groundwater bodies and a general structure of criteria, giving guidance on the derivation process for environmental thresholds. Th work is done refering to data and information from the 'upstream' work packages (WP1 and WP2) and the drafted methodology will be transferred to the 'downstream' work packages for a validation by case studies (WP4), socio-economic assessment (WP5) and to inform policy makers and stakeholders (WP6).
Work-package 4: Representative sites / water body studies and compliance testing
The work package will have to evaluate the developed approach and application of environmental thresholds recommended in BRIDGE WP3 at selected European representative sites. Results will be transferred to WP5 and WP6 for economic assessment and communication respectively.
Work-package 5: Economic and social costs linked to the establishment of groundwater threshold values
WP5 will support the identification of economically efficient threshold values for groundwater pollutants based on socio-economic impact assessment procedures. It needs results from WP2, WP3 and WP4 (as previously described). Economic and social costs impacts will permit the final synthesis of one pragmatic methodology (WP3) and for general communication (WP6).
Work-package 6: Information and dissemination
The specific objective of Work Package 6 is to stimulate the cooperation and interaction between the the different partners, the Advisory Committee, the Working Group C and the European Commission. It takes charge of the general communication of the Bridge project. This WP will benefit of inputs for each WP in order to display efficient communication between partners in the project and with policy makers and stakeholders to obtain a real consensus about proposed methodology.
|
Project
Summary:
See project objectives
|
Achieved Objectives:
Publicly available deliverables
Brief Project Presentation
Project Presentation
Newsletter BRIDGE
D10 BRIDGE (WP2): Impact of hydrogeological conditions on pollutant behaviour in groundwater and related ecosystems
D 7 BRIDGE (WP1): Behaviour and effects of groundwater pollutants
D12 BRIDGE proposal for a methodology frame_final.pdf
D13 BRIDGE WP3 National Monitoring Strategies_final.pdf
D14 Report on National Methodologies for Environmental Threshold Values
D15 BRIDGE Preliminary Methdology to derive Environmental Threshold Values
D31 BRIDGE Working Plan Report of WP6
D33 BRIDGE project presentation
D4 BRIDGE Work plan for information search
D5 BRIDGE Reference Bas
D5 BRIDGE: Reference overview of EU-funded research, national reports and literature relevant to environmental thresholds
|
Product Descriptions:
See achieved objectives
|
Additional Information:
|
Project Resources:
|
Weblink:
http://www.wfd-bridge.net
|
Funding Programme(s):
EC Framework Programme 6
|
Link to Organisations:
Umweltbundesamt (Environmental Protection Agency)
European Environment Agency
BRGM - Geosciences pour une Terre durable (Geosciences for a sustainable Earth)
|
Submitted by:
Professor Paul Bardos
Who does what?
07/11/2006 15:54:00
|