Title: |
Rescue Project: Technical and institutional validation reports for Wp2-5 Stakeholder & Validation Team
|
Resource Type: |
document --> technical publication --> report
|
Country: |
EU Projects
|
Year: |
2005 |
Availability: |
Rescue Consortium (2005) Technical and institutional validation reports for Wp2-5 Stakeholder & Validation Team. Deliverable D 8.1-5
|
Author 1/Producer: |
Rescue Consortium
|
Author / Producer Type: |
EC Project
|
Format (e.g. PDF): |
PDF
|
EUGRIS Keyword(s): |
Brownfields
|
Short description: |
This deliverable summarises the monitoring and validation work carried
out by the RESCUE “Stakeholder & Validation Team - SVT” (WP8).
Within the RESCUE working structure the SVT was set up as external
instrument for quality control. One task of this quality control was to
monitor the progress of RESCUE. The other task was to check the validity
of RESCUE results by a representative array of end-users on a
wider European basis.
The comments, remarks and recommendations of the Stakeholder &
Validation Team contributed in developing the RESCUE guidance reports
(D 2.1-D 6.1) and the report on administrative tools and incentives
(D 2-5.2). Conclusively the feedback will be integrated in the final
RESCUE product, the “Manual of tools for an European system approach
in sustainable brownfield regeneration”.
|
Submitted By:
|
Dr Stefan Gödeke WhoDoesWhat?
Last update: 28/09/2006
|
|